INGTOP Métal – Service pits for Railway vehicles JBR 90

SERVICE PITS FOR RAILWAY VEHICLES – JBR 90


Technical description

SERVICE PIT DIMENSIONS
Width 1.4 – 1,5 m
Height 1.5 m
Length 7 – 40 m
Pitch between HEB 140 – U 180 sections – 940 mm
Loading capacity – maximal load 30.000 kg
Load from axles 6 x 5.000 kg
Load from lifting jack for a wheel 4 x 3.000 kg

Material
quality S 235
Sections U 140 – U 180
Frame metal sheet 4 mm thickness

Total mass with axial cases 4.450 – 25.350 kg
(without grid flooring, width 990 mm)


Basic Equipment of the Service Pit

AIR-CONDITIONING EQUIPMENT

 Fresh air supply (DN 100) according to ČSN 73 6059 – 3.

COMPRESSED AIR DISTRIBUTION

 2 – 8 connecting points + distribution

ELECTRICAL INSTALLATION

• Lighting – 4 – 18 pieces of swivelling lamps
• Plug sockets – 2 – 8 pieces 230 V
• Cables
• Circuit breakers – 2 pieces
• Installation
• Review and electro documentation
• Electrical switchboard
• Sludge pump for discharge of dirt from the service pit

OTHER EQUIPMENT

• Stairs with 7 steps, length 1,5 m – 1 piece (one step height 188 mm)
• Ladder – 1 piece (entry side)
• Grid flooring with a sump
• STYRODUR insulation of 20 mm thickness – light blue
• Basic and top coating (finish coat RAL 7035a, finish coat inertol Sika poxitar F- shade 9017)

PACKAGING

• Wooden blocks
• Ascendable wooden covering
• Foil covering

OTHER SERVICES

• Documentation for building approval
• Cooperation with construction designer
• Service pit loading
• Supervision prior to concrete works (necessary condition for guarantee observance)


Additional equipment of the service pit for extra costs

BRAKE EXTENSION FOR A BRAKE BENCH

The brake extension is designated for storage of technical equipment of brake bench adjustment; it is produced from steel plates and sections. The brake bench is designated for measurement of:

• Left / right brake force
• Left / right rolling-resistance force
• Ovality level
• Front and rear brake efficiency
• Total brake efficiency of the vehicle
• Parking brake efficiency

AXIAL EXTENSION FOR CLEARANCE DETECTOR

Phases de construction

The axial extension is designated for storage of technological equipment for geometry alignment of wheels. The axial extension of the service pit is produced from steel plates and sections. Inputs for electrical installation and drainage of liquids are made in the axial extension of the service pit.

Individual stages of construction readiness

1st stage –excavation pit realization
2nd stage – base plate preparation
3rd stage – placing the service pit on the base plate
4th stage – connecting of the service pit with the service floor


 

Electrically controlled roller shutter



Manufacturer’s website : INGTop Métal

Product PDF :  INGTop Métal-JBR90

Catalogue : fosse-maintenance